
Tenarc designs, builds, and delivers IEEE/ANSI-certified power transformers from six manufacturing facilities — on a schedule you control, not one you inherit.
Generator, auto, interconnecting, and STATCOM transformers. KEMA dynamic short-circuit tested up to 500 MVA. 12 units cleared at CPRI on first attempt.
Oil-filled, pad-mounted, and hermetically sealed. IEEE C57.12.34 compliant pad-mount designs for US installations. 10 kVA to 12,500 kVA.
Multi-winding inverter duty transformers for solar, wind, and storage. 2 to 7 winding configurations. 12+ GW installed globally.
Voltage regulation and harmonic control for EHV transmission. Fuji Electric licensed technology for 400 kV and 765 kV class.
Furnace (EAF, SAF), rectifier (160 kA DC, 24-pulse), traction, and generator duty. Up to 400 MVA furnace duty.
Natural ester fluid-filled transformers up to 400 kV. Unitised packaged substations per IEC 62271-202, up to 6,300 kVA.
Scale power infrastructure to match compute demand growth.
Connect generation and storage to the grid on schedule.
Replace aging fleet and expand grid capacity.
Accelerate project timelines with reliable supply.
Voltage class, MVA rating, quantity, standards, timeline. Engineering confirms design, materials, compliance. Budgetary pricing within five business days.
GA drawings, thermal calculations, impedance analysis, BIL coordination. Submitted for buyer review and approval.
ISO 9001/14001/45001-certified facilities. In-process QC at every stage. Climate-controlled winding with positive air pressure.
NABL-accredited labs. Ratio, impulse, partial discharge, temperature rise, short-circuit withstand. Full test reports provided.
Optional buyer-witnessed or independent audit. Remote video witnessing available for critical tests.
Nitrogen-filled maritime packaging. Deep-water ports. West Coast 25–30 days, East Coast/Gulf 35–45 days.
HTS classification, tariff analysis, duty optimization, customs clearance. Landed cost upfront.
Route surveys, permitting, escort vehicles, crane coordination. Port to foundation.
Erection, oil processing, bushing installation, insulation testing, energization support.
DGA guidance, FRA, field diagnostics, repair, on-site MVPD up to 500 MVA.
OngoingSteps 1 through 9. Spec sheet to energized transformer. Under twelve months, for most configurations.
| US / European OEM | Tenarc | |
|---|---|---|
| Lead time | 24–36 months | <12 months |
| Standards | IEEE / ANSI | IEEE / ANSI |
| Short circuit testing | KEMA / lab tested | KEMA / CPRI tested |
| Voltage range | Up to 765 kV+ | Up to 1,200 kV |
| Capacity | Heavily backlogged | 125,000+ MVA/yr · 6 facilities |
| Compliance & logistics | Buyer manages | Managed end-to-end |
IEEE C57, ANSI, IEC 60076. Type-tested at KEMA Netherlands, CPRI, ERDA.
In-house labs per ISO/IEC 17025. Routine and type testing up to 1,200 kV class.
Americas, Europe, Oceania, MENA, Africa. Including the USA, UK, Australia, Germany.
Factory to US site. Packaging, ocean freight, customs, last-mile heavy-haul.
Gujarat, Rajasthan, Maharashtra, Uttarakhand. 125,000+ MVA/yr combined.
Commissioning, diagnostics, repair. On-site MVPD up to 500 MVA.
Share your transformer specs. Budgetary pricing in five business days.
mahender@tenarc.systems